North Ferrisburgh Substation
Response to the Town of Ferrisburgh's March 10, 2008 Letter
Order Re Revised North Ferrisburgh Substation Design - 1.10.08
VELCO’s construction of the Ferrisburgh substation is slated to begin on January 21, 2008. - Letter to neighbors
- Letter
- Memorandum from Josh Castonguay to Megan Ludwig dated December 7, 2007, regarding the GMP 3322 Line - Ferrisburgh
- General Arrangement drawing, Ferrisburgh VELCO 3322 Line Bypass
- Plan and Profile, Ferrisburgh 3322 Line Bypass
- Memorandum from Brian Connaughton to Megan Ludwig and Rick Hollenbaugh dated December 13, 2007, regarding Environmental Criteria Relocation of the GMP 34.5 kV Line at the VELCO North Ferrisburgh Substation
- Memorandum from Josh Castonguay to Aaron Storo dated December 4, 2007, regarding Dennar Plastics Line Relocation
- GMP Distribution Line photos, North Ferrisburgh 1 2 3
- GMP Distributiori Burial, Plan and Profile Drawing
Docket 6860; Updated North Ferrisburgh Substation Mitigation Plan
North Ferrisburgh Substation CGP
Army Corp of Engineers Permit - NRP 115 Permit
Docket 6860 - North Ferrisburgh Substation Alternative Design Plans May, 2007
Letter_No. Ferrisburgh
Jeff Predom Memo
One Line Diagram
General Arrangement Plan
General Arrangement Elevations
Site Grading Plan
Tree Clearing Plan
Landscape Mitigation Plan
Docket 6860 - North Ferrisburgh Substation Environmental and Archeological Assessments May, 2007
Letter
Clapp Memo
Gilman Memo
Bergendahl Letter
Memorandum dated 8/31/06 RE: Relocation of North Ferrisburgh Substation
8/3/06 North Ferrisburgh Substation Revised Final Plans
North Ferrisburgh Substation Final Plans Submittal
10 February, 2006 Pre-Construction Noise Study for:
NORTH FERRISBURG, QUEEN CITY, SHELBURNE, AND ESSEX SUBSTATIONS